We will tear out and replace deck boards with new composite boards.
Outdoor Deck Made from Gray Low-Maintenance Composite Decking.
200 SQF Composite Deck - Picture Frame Surrounds.
Total $7,000 or $35/SQF - 2-3 Laborers 2-4 weeks start to finish.
FREE PRIVACY WALL ON THE WEST SIDE.
We will use the existing lumber and composite decking purchased to build a deck. Deck labor costs are $15 to $35 per square foot.
We charge *$20/square foot as a start.
$20x400 = $8,000 + $1200 (permitting)
Board Qty at 20' = 65 your receipt says 70.
*Note: This quote is a low profile 2x8 rafter sub frame at 16" center to center.
This is to reduce the steps. No steps to get in and out of this deck.
This quote uses cement blocks not cement poured piers at below grade x 12" diameter. If Skokie requires cement piers, we will add that cost as a line item.
12 Foot deck porch board repairWe will tear out and replace deck boards with new treated "cut to fit" deck boards. Replace 6 boards $690.00 Replace 9 boards $900.00 Replace 12 boards $1,200.00 Replace 24 boards $2,000.00 No dumpster needed. We will remove all the old material. |
340 Square Foot deck porch board replace all boardsWe will tear out and replace deck boards with new composite boards. Outdoor Deck Made from Gray Low-Maintenance Composite Decking. 340 SQF Composite Deck Total $11,900 or $35/SQF - 2 Laborers 2-4 weeks start to finish. Customer to order a small dumpster for old lumber. |
Window Sill Rebuild
|
COMPOSITE DECK 200 SQF WITH STAIRS AND RAILOutdoor Deck Made from Gray Low-Maintenance Composite Decking. Composite Deck + Stair Case and Railings Total $9,500 4-6 weeks start to finish. |
We will build a 20 x 28 Pool Deck made of composite and treated wood.
Total Cost Range Between $15,820.00 and $16,320.00
Stair case on East side.
Note: The railing budget is for the West and South side.
This is a budget for materials and labor 50/50. So if materials are more than $500 then the budget is 2x materials costs. Choose from different colors and types.
PAY WITH CONFIDENCE IF THERE’S EVER A PROBLEM WITH YOUR PROJECT, YOU CAN ALWAYS PUT A HOLD ON THE FUNDS UNTIL THE ISSUE IS RESOLVED. PAY-PAL WILL INVESTIGATE UNTIL THE PROJECT IS COMPLETE.
Above ground pool steps and ladders are important pool equipment for the safety of pool users and drunkards. Our custom design allows you to pound a few drinks and when you need to take a piss, you can climb your fat ass out of the pool, run out to the fence and let it all out in you neighbors yard. Choose from different heights. See below.
Healthy RootsGlenview, Illinois 60025
Established in 2008 |
847-363-3237All rights reserved.
We respect your privacy. We never share or sell your personal information with any third parties. Any information collected through this site is intended to be used for this and future transactions only. Your personal information is secured via SSL (Secure Socket Layer) Technology. |
We use Square at the check out.Google and Apple pay are also availble
Terms and Conditions & Shipping Policy |